A simple starter website can be live in about one week. A typical business website of 5–15 pages takes 3–6 weeks, an online store 6–14 weeks, and a custom web platform or app three months or more. The biggest delays are almost never the coding: they are late content, slow feedback and changing the scope halfway through.
“How long will it take?” is the second question almost every client asks, right after cost. The honest answer depends on what you are building and how quickly you can make decisions. This guide shows realistic timelines for each type of project, what makes them longer, and how to keep yours on track.
Typical timelines at a glance
| Type of project | Typical timeline | Assumes |
|---|---|---|
| Starter website (1–3 pages) | About 1 week | Ready text and images, template-based design |
| Business website (5–15 pages) | 3–6 weeks | Custom design, content mostly ready |
| Online store | 6–14 weeks | Product data ready, payments and shipping decided |
| Web platform or portal | 3–6 months | Defined user roles and a written scope |
| Mobile app (first version) | 3–6 months | One platform, a clear core feature set |
These are typical ranges for a well-run project. A timeline quoted far below these should make you ask what is being left out.
The phases of a website project
Most projects move through the same five phases. Knowing them helps you see where the time goes:
- Discovery (2–5 days): goals, audience, pages, features and a written scope.
- Design (1–2 weeks): layout and visual direction, approved before any development starts.
- Build (1–3 weeks): development, content entry and integrations.
- Testing (3–5 days): mobile and desktop checks, speed, forms and payments.
- Launch and handover (1–2 days): domain, hosting, analytics and a short training session.
Design and build take the longest, but the slowest phase is almost always waiting for the client to approve something.
What makes a project take longer
- Late content. Text, photos and product data are the most common cause of delay. Write them while the design is being made, not after.
- Slow approvals. A review that takes two weeks adds two weeks to the project. Name one person who can approve decisions.
- Scope changes. Adding a page or feature after the design is approved means redoing work. Put new ideas on a list for phase two.
- Third-party access. Payment gateways, courier accounts, domain registrars and CRM tools can each take days to set up. Start those requests on day one.
- Many stakeholders. The more people who must sign off, the more rounds of feedback you will need.
- Arabic and English together. A bilingual site needs its right-to-left layout and translations tested in both languages, which adds time. Our Arabic website checklist covers what to plan for.
Fixed prices — websites from $300, custom sites from $1,000, stores from $1,500. Free call and a proposal within a week.
How to shorten your timeline
- Start with a template-based starter site if you need to be online quickly, then upgrade to a custom design later.
- Prepare your content first: logo, photos, service descriptions, prices and contact details.
- Agree on a fixed list of pages before design begins.
- Set a feedback window in the contract, such as three working days per review round.
- Launch in stages: go live with the essential pages, then add blog posts, case studies and extras.
What a good timeline looks like
A reliable studio gives you a written plan with dates for each phase, a named project manager, and a weekly update. Ask for a working preview at the end of design and again before launch, so problems show up early rather than on launch day.
Be wary of a studio that promises a complex platform in two weeks or will not commit to milestones in writing.
Frequently asked questions
Can a website really be done in a week?
Yes, for a small starter site built on a proven template with content you already have. Anything custom or larger takes longer.
Why does my website take longer than the agency said?
The most common reasons are late content, slow approvals and changes to the scope. A written scope and agreed review times prevent most delays.
Can I launch before the project is finished?
Often, yes. Launching the essential pages first and adding the rest later is usually faster and gets you found sooner.
How long does it take for a new site to appear on Google?
Google can index a new site within days, but ranking takes months. Plan for steady SEO work after launch rather than instant results.
Planning your project with Stratum
We build starter sites in about a week, business websites in three to six weeks and online stores in six to fourteen weeks. Every project starts with a free call and ends with a written plan and a fixed-price proposal. See our web development services or request a quote.